Costa Rica Karch Hydropower Station, 3 units were installed in the original station,2 sets of 34.8mw vertical mixed flow units were installed in 1#and 2# unit, one set of 36.1mw vertical mixed flow unit was installed in 3# unit. the 3 units were replaced and upgraded in 2001~2003.
We KUYUD provided fittings, low voltage component for the project.